Essential Oil Supplier - Milton Keynes :-
Before Mezzanine After Mezzanine
Ground Floor Partitioning 1st Floor Partitioning
270m2 Mezzanine Floor (5Kn/m2) to create additional space for bulk storage of essential oils. 38mm thick P5 moisture resistant particle board was used in case of any spills or leakages. Access was via 2No. steel staircases, one of which was designed to Part M (Building Regulations) to comply with our approved building inspectors wishes for disabled access onto the mezzanine structure. One hour fire protection was provided via a fire rated suspended ceiling to the underside of the structure with white 60 minute column casings fitted to the mezzanine columns whilst exposed ceiling edges were trimmed by installing a fire rated upstand fascia panel. The mezzanine edge itself as installed with a steel handrail c/w built in steel kick plate. Pallet access onto the floor was via a steel "Up & Over" safety pallet gate.
Ground Floor Partitions - 30 Linear metres of 30 minute fire rated stud & plasterboard partitioning c/w quilt infill panels within the partition void to reduce sound transfer and to increase thermal properties. DDA (Disability Discrimination Act) compliant doors (Oak Veneer) were fitted throughout the installation.
1st Floor Partitions - 25 Linear metres of premium quality office partitioning was installed to our customers requirements. This consisted of white powder coated aluminium trim sections, Double glazed windows c/w integral 25mm wide blinds & Oak veneered door sets. Our customer has already suggested that he would like T2 Storage Solutions Ltd (Nottingham) to carry out future projects for him as & when their business grows to the next level.
Computer Software Company - Mansfield, Nottinghamshire :-
A rapidly growing healthcare software company contacted us with a view to completely "fitting out" the 3rd floor of a brand new, purpose built office block in Mansfield. Our work involved the installation of several types of new "premium" office partitioning systems. Design details such as white powder coated aluminium sections, Double Glazing with integral venetian blinds, Solid core Cherry veneered doors and special seamless white "wipe board" walls ensured this installation stands out from the crowd. We also installed our "Clarity" fully glazed, silicon jointed office partition system to form a new centrally positioned meeting room.
We also installed 2No. new kitchen areas with in-built electrical appliances including all floorcovering, plumbing, tiling & electrical works. Window blinds and Unirack archive shelving was installed to meet our customers requirements.
Another project completed ahead of schedule and to the agreed budget.
Fashion Retailer (University Outfitters) - National Distribution Centre - London :-
T2 Storage Solutions Ltd (Nottingham) were recently contracted to "fit-out" a new National Distribution Centre for a well known high street fashion brand in Greenford, London. Works involved Office Partitioning, 90 Minute Fire Protection to the underside of a mezzanine floor, 90 Minute fire rated escape tunnells, New designer kitchen units & area, Suspended Ceilings, Decoration throughout, Carpet Tiles and Vinyl Floor Coverings. The whole project was managed by our own Contracts Manager who liaised with the customer on a daily basis to ensure their requirements were met or exceeded which ensured another T2 project finished slightly ahead of schedule.
Recruitment Company (Worksop, Nottinghamshire) - Office Fit Out Works :-
An expanding recruitment company needed a larger head office and were looking for a suitable contractor to "Fit Out" their new offices in Worksop. After the initial consultation T2 (Nottingham) presented our customer with a comprehensive quotation and CAD (Computer Aided Design) drawings to show the proposed layout and how their corporate colour 'Red' could be used in the design. Work included :-
Office Partitioning powder coated in Red.
Double Glazed Window units with integral venetian blinds.
Solid Core Beech veneered doors with quality door ironmongery.
Kassini - Beech MFC Office Furniture with cable management system.
Meeting Room & Reception Area Furniture / Office & Reception area seating.
Suspended Ceiling work / Unirack Archive Shelving.
Contract was completed within 5 days leaving our customer proud of his new offices.
Costume Supplier (Stoke) - Complete Storage & Office Solution
.jpg)
.jpg)
Our customer came to us, looking for help & guidance with regard to designing and managing a complete "fit-out" project from start to finish as they had grown out of their current industrial unit. After discussing their requirements in great detail (both current & future) we installed a 180m2 mezzanine floor designed to give a uniformal distributed load of 5Kn/m2 along with 2No. staircases to comply with means of escape fire regulations. The entire underside of the structure & supporting columns were cladded to give 1 Hour Fire Resistance protection which meant that offices could be built at either level. Demountable, fire rated partitions were installed in a colour scheme selected by our customer to match their corporate identity. Other works included - Electrics, Wall Lining (taped & jointed to leave smooth, flat finish), Floor Coverings - Carpet & Vinyl types, Decoration throughout, New Kitchen Area & Toilets (c/w plumbing), Heating, Warehouse Lighting & Building Regulation Approval. This project was completed ahead of time and not a penny over budget leaving us with another very satisfied customer.
Memory Card Manufacturer & Supplier (Walsall) - "Turnkey" Storage & Office Solution
Total turnkey installation in a new industrial unit in Walsall, West Midlands. Project was completed in less than 3 weeks and ready for our customer to move into on time and to agreed budget. Works consisted of a 103m2 - 5Kn/m2 storage use mezzanine floor, Office Partitioning, Electrics, 1 Hour Fire Proetction to mezzanine structure, Kitchen area, Wall Lining, Floor Coverings and an Air Conditioning unit.
T2 Storage Solutions (Nottingham) handled the entire project from start to finish handling the Building Regulation approvals on behalf of our customer who are very pleased with the standard of work undertaken.
Artificial Sports Surfacing Supplier (Leicestershire) - Small Racking Installation
Due to the success of a sports surfacing company, it was clear the needed more warehouse space and a suitable racking solution to meet their requirements.
After a consultation with racking experts T2 Storage Solutions we came up with the following racking specification. Stow Pallet Racking - 4.5m high x 3.3m wide x 4m deep with a maximum of 4 beam levels (all 3 tonne capacity). Each beam level was fitted with 25mm thick chipboard decking boards to ensure all the rolls of carpet were kept level and well supported. Steel upright protectors were fitted at low level of the racking frames to protect against fork lift truck damage.
Textile Company - Hucknall, Nottinghamshire (Mezzanine Floor)
An expanding local textile company purchased a newly built warehouse in Nottingham and contacted T2 to help them to fully utilise their space efficiently. We installed a 300m2 - Industrial mezzanine floor for storage purposes along 3 walls giving it a unique "C" shape. To optimise the available cubic capacity of the building, the new mezzanine floor was built over an existing blockwork office area, thus creating additional storage space. T2 completed the project on time and to the exact originally quoted price in our quotation leaving our customer very happy.
BEFORE AFTER
Car Interiors Manufacturer - Staffordshire (Turn Key Project)
We were tasked with installing a new canteen & QA Area within a 2 week period to coincide with our customers shutdown period on a new mezzanine floor. Works involved Jumbo stud partitions, Free-standing office partitioning, Wall Lining -
(dry-lining), Fire rated suspended ceiling to the underside of the mezzanine floor, Electrics, Plumbing, Decoration works throughout and heavy duty contract flooring. Our customer could not believe what had been achieved in the time-scale and the installation was ready for their employees when returning to work after their shutdown and was delighted that we did not compromise their production facility.
National Glass - Repair & Replacement Company - Nottingham
Small industrial mezzanine floor for additional storage / office space within a newly built industrial unit in Hucknall. Completed within 48 hours including the installation of 1 Hour Fire Protection in the form of a fire rated suspended ceiling to the underside of the mezzanine floor steelwork. Our customer is so pleased with T2 Storage Solutions that we have received further orders for other sites around the country as they expand their business.
.JPG)
.JPG)
Game Manufacturer, Nottingham
Large Mezzanine Floor (1,600m2) to form a new storage / working platform. This was a particularly tricky installation as the mezzanine floor had to be installed over an existing conveyor and carton live storage system without compromising our customers 24 hour operation. This was a complex, well planned multi product installation carried out under CDM regulations. Other works involved 1 Hour Fire Protection, Goods Lift, Lighting to underside & Smoke detection. This project was carried out on time and to budget leaving our customer delighted with the installation. Phase 2 involved building Stow longspan shelving on the mezzanine floor to re-accomodate their Euro-Direct department without compromising their operational works.
Adult Novelties - Newark, Notts (Multi Product Project)
An expanding local supplier of adult novelties recently moved into a new industrial unit in Newark. They asked T2 Storage Solutions to design their warehouse to fully utilise all the available space. After discussing the project at length we installed a new 5KN/m2 Mezzanine Floor, Stow Pallet Racking, Unirack Shelving, Longspan Shelving and Lighting (both floors) c/w a smoke detection system. We handled all the Building Regulation Applications on our customers behalf. All the work was completed within a 2 week period and to the exact budget we had agreed prior to starting the installation.
Telecommunications Company - Kettering (Office Refurbishments)
T2 Storage Solutions were asked to install new office accommodation to an existing mezzanine floor area previously used for storage purposes. Our works involved wall lining, office partitioning, suspended ceilings c/w sound insulating quilt overlay, electrics, carpet tiles, internal blinds within double glazed windows, decoration and ventilation. Within a few days the area had been completely transformed and an area for our customer to be proud off.
.jpg)
.jpg)
Main areas covered - Nottingham, Leicester, Lincoln, Derby, Castle Donington, Birmingham, Sheffield, Yorkshire, Northampton, Milton Keynes, Stoke on Trent, Coventry, Peterborough, Worksop, Chesterfield, Newark on Trent, Grantham, Burton upon Trent, Tamworth, Kettering, Rugby, Boston, Spalding, Hull, Rotherham, Doncaster, Barnsley, Huddersfield, Leeds, Bradford, York, Mansfield, Sutton in Ashfield, Kirkby in Ashfield, Nuneaton, Hinckley, Peterborough, Stamford, Swadlincote, Ashby de la Zouch, Uttoxeter, Sleaford, Alfreton, Long Eaton, Newcastle under Lyme, Melton Mowbray, Ripley, Belper, Ilkeston, Loughborough, Coalville, Ashbourne, Matlock, Chesterfield, Worksop, Leek, Retford, UK.